Issue metadata
Sign in to add a comment
|
A one-sentence summary takes your complex book with multiple characters and plotlines and boils it down into a simple statement that can be quickly conveyed and understood, and generates interest in the book.
Reported by
alan.tab...@gmail.com,
Dec 29 2016
|
||||||||||||||||||||
Issue descriptionUserAgent: Mozilla/5.0 (Windows NT 6.1) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/55.0.2883.87 Safari/537.36 Steps to reproduce the problem: 1. → A character or two 2. → Their choice, conflict, or goal 3. → What’s at stake (may be implied) What is the expected behavior? In 2007, Matt and Jason started a company that they could work at forever. Bootstrapped. Working on their own terms. Hiring the kind of friends they wanted to go on vacation with. Working on products that made life just a little bit better. What went wrong? I'm sick of always hearing All the sad songs on the radio All day it is there to remind an over sensitive guy That he's lost and alone, yeah Did this work before? Yes All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the European Concrete Platform ASBL. Published by the European Concrete Platform ASBL Editor: Jean-Pierre Jacobs 8 rue Volta 1050 Brussels, Belgium Layout & Printing by the European Concrete Platform All information in this document is deemed to be accurate by the European Concrete Platform ASBL at the time of going into press. It is given in good faith. Information on European Concrete Platform documents does not create any liability for its Members. While the goal is to keep this information timely and accurate, the European Concrete Platform ASBL cannot guarantee either. If errors are brought to its attention, they will be corrected. The opinions reflected in this document are those of the authors and the European Concrete Platform ASBL cannot be held liable for any view expressed therein. All advice or information from the European Concrete Platform ASBL is intended for those who will evaluate the significance and limitations of its contents and take responsibility for its use and application. No liability (including for negligence) for any loss resulting from such advice or information is accepted. Readers should note that all European Concrete Platform publications are subject to revision from time to time and therefore ensure that they are in possession of the latest version. This publication is based on the publication: "Guida all'uso dell'eurocodice 2" prepared by AICAP; the Italian Association for Reinforced and Prestressed Concrete, on behalf of the the Italian Cement Organziation AITEC, and on background documents prepared by the Eurocode 2 Project Teams Members, during the preparation of the EN version of Eurocode 2 (prof A.W. Beeby, prof H. Corres Peiretti, prof J. Walraven, prof B. Westerberg, prof R.V. Whitman). Authorization has been received or is pending from organisations or individuals for their specific contributions. Chrome version: 55.0.2883.87 Channel: stable OS Version: 6.1 (Windows 7, Windows Server 2008 R2) Flash Version: Shockwave Flash 24.0 r0 The rating scale for Performance Planning and Review is made up of five factors: Poor, Needs Improvement, Meets Requirements, Exceeds Requirements, and Outstanding. Any factor rated poor or needs improvement MUST have performance comments. For any factor, performance comments should support the rating given. |
|||||||||||||||||||||
►
Sign in to add a comment |
|||||||||||||||||||||
Comment 1 by mmenke@chromium.org
, Dec 29 2016