Track the number of suite jobs created by suite scheduler at each hour |
||
Issue descriptionThe number should be a good indicator about how much load suite scheduler adds to the lab. counter can indicate the trend but it's an averaged number. To reflect the exact number of suites created, we need to add up the suites created by suite scheduler in a given hour. We can do that in driver's event handling loop. The cut off time may not be exact but should be OK.
,
May 4 2016
,
Mar 16 2018
Bulk closing Infra>Client>ChromeOS issues untouched in over a year. |
||
►
Sign in to add a comment |
||
Comment 1 by benhenry@google.com
, Apr 26 2016Labels: -Infra-ChromeOS